COMPLETION
Move in was on July 1, 2007. Pictures will be posted as each room or section of the house is completed.
front View (North)
West wall with light well
but no fire escape installed
Store
Large guest bedroom
2nd floor
Master bedroom veranda
2nd floor
Main Veranda
2nd floor
Orange CR
1/2 bath
Store
Light Well above dining area
1st floor
Ceiling in Sala (Living Room)
1st floor
Sala(Living Room)
1st floor
Front Enterance
and Lelia
Front of house
door and upper veranda
Main Veranda
Second Floor
Main Veranda
Second Floor
Hallway
Second Floor
Pink CR
3/4 Bath Second Floor
Outside Stairs
ground to 2nd floor